The United Engineering Process

From Problem to Proven Solution

Our team analyzes industrial ventilation issues and engineers’ solutions that meet the customer’s performance, financial, and sustainable goals. We Improve safety, health and productivity with engineered Industrial Ventilation Systems which include:

  • Issue: We start by meeting with you at the site to identify the issue.
  • Engineering: After we identify the issue, we typically engineer systems in two phases.
  • First, we apply basic high-level engineering for the sole purpose of getting accurate budgetary costs as soon as is possible. This is our Schematic Design (SD) Phase.
  • Second, (once a rough budget is established) we develop the system design and get competitive bids including a detailed line-item report of all the project costs from A-Z. This is our Design Development (DD) Phase.
  • Installation: Finally, when the costs are approved, we oversee the construction from start to finish. This is our System Installation (SI) phase.

What makes us different?

United Engineering is a Prime Engineering Firm. Our team is responsible for the entire project from design through completion. Systems are professionally engineered and installed at the best possible cost. The customer has one source of responsibility for the entire project.